summary |
shortlog | log |
commit |
commitdiff |
tree
first ⋅ prev ⋅ next
Steven Baltakatei Sandoval [Fri, 25 Sep 2020 20:32:53 +0000 (20:32 +0000)]
chore(PID-1-SHT1):REV E:Fix metadata, update legend
modified: DEL/BK-2020-04-PID-1-SHT1.pdf
modified: DWG/BK-2020-04-PID-1-SHT1.svg
modified: REVISIONS.org
modified: TODO.org
Steven Baltakatei Sandoval [Fri, 25 Sep 2020 20:10:02 +0000 (20:10 +0000)]
feat(PID-1-SHT7):REV A:Initial draft
Finished adding all groups up through 29 to sheet 7.
new file: DEL/BK-2020-04-PID-1-SHT7.pdf
new file: DWG/BK-2020-04-PID-1-SHT7.svg
modified: REVISIONS.org
modified: TODO.org
Steven Baltakatei Sandoval [Fri, 25 Sep 2020 17:54:21 +0000 (17:54 +0000)]
feat(PID-1-SHT6):REV A:Initial draft
Drew groups 21-25 (valves, pipe fitting, pipe)
new file: DEL/BK-2020-04-PID-1-SHT6.pdf
modified: DWG/BK-2020-04-PID-1-SHT6.svg
modified: REVISIONS.org
modified: TODO.org
Steven Baltakatei Sandoval [Fri, 25 Sep 2020 17:04:27 +0000 (17:04 +0000)]
hold(PID-1-SHT6):REV A:Pausing drawing temporarily
Taking break.
Steven Baltakatei Sandoval [Fri, 25 Sep 2020 14:06:12 +0000 (14:06 +0000)]
feat(PID-1-SHT5):REV A:Initial draft.
Contains groups 18-20.
new file: DEL/BK-2020-04-PID-1-SHT5.pdf
new file: DWG/BK-2020-04-PID-1-SHT5.svg
Steven Baltakatei Sandoval [Fri, 25 Sep 2020 10:08:38 +0000 (10:08 +0000)]
fix(PID-1-SHT3):REV C:Fix legend arrow color
Steven Baltakatei Sandoval [Fri, 25 Sep 2020 09:29:40 +0000 (09:29 +0000)]
fix(PID-1-SHT4):REV B:Fix legend arrow color
Steven Baltakatei Sandoval [Fri, 25 Sep 2020 09:04:38 +0000 (09:04 +0000)]
feat(PID-1-SHT-4):REV A:Initial draft
Draw diagram for symbols in ISO 10628-2:2012 Groups 10-17.
new file: DEL/BK-2020-04-PID-1-SHT4.pdf
new file: DWG/BK-2020-04-PID-1-SHT4.svg
modified: REVISIONS.org
modified: TODO.org
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 14:55:51 +0000 (14:55 +0000)]
chore(TODO):Update task list
Update projected groups that sheets will contain.
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 14:49:27 +0000 (14:49 +0000)]
Merge branch 'feature/pid-1-sheet-3/BK-2020-04' into develop
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 14:47:51 +0000 (14:47 +0000)]
fix(PID-1-SHT3):REV B:Fix title group nums and metadata
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 14:42:31 +0000 (14:42 +0000)]
chore(TODO):Update task list
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 14:38:11 +0000 (14:38 +0000)]
feat(PID-1-SHT3):REV A:Initial draft
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 11:53:10 +0000 (11:53 +0000)]
Merge branch 'develop' into feature/pid-1-sheet-3/BK-2020-04
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 11:52:08 +0000 (11:52 +0000)]
fix(PID-1-SHT-2):REV F:Fix minor text misalign
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 11:48:16 +0000 (11:48 +0000)]
draft(PID-1-SHT3):REV A:Add more symbols
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 09:50:32 +0000 (09:50 +0000)]
style(REVISIONS.org):Minor column header changes
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 09:48:01 +0000 (09:48 +0000)]
Merge branch 'develop' into feature/pid-1-sheet-2/BK-2020-04
Update and combine sheet 2 branch's REVISIONS.org file.
Conflicts:
REVISIONS.org
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 09:43:29 +0000 (09:43 +0000)]
style(REVISIONS.org):Remove superfluous field in rev histories
"Identification code" not needed multiple times since history is
already segmented into multiple lists by this same field.
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 09:29:22 +0000 (09:29 +0000)]
style(PID-1-SHT-2):REV E:New layer:group partition objects
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 06:47:09 +0000 (06:47 +0000)]
style(REVISIONS.org):Change format to be more diff-compatible
Break up revision list into two lists:
1. File Locations
2. Revision History
Note: A benefit of having individualized histories of each file is
that it allows a future "Revision History" section to be added to a
drawing. Also, updates to `REVISIONS.org` will be easier to merge.
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 06:18:46 +0000 (06:18 +0000)]
fix(PID-1-SHT2):REV D:Fix minor text misalign
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 06:10:01 +0000 (06:10 +0000)]
fix(PID-1-SHT2):REV C:Remove errant line
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 05:54:01 +0000 (05:54 +0000)]
merge(PID-1-SHT2):REV B:Merge in sheet 2 changes
Merge required instead of fast-forward since REVISIONS.org also
changed.
Merge branch 'feature/pid-1-sheet-2/BK-2020-04' into develop
Conflicts:
REVISIONS.org
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 05:46:49 +0000 (05:46 +0000)]
style(PID-1-SHT1):REV D:Align symbols
Align symbols on sheet 1 so they match sheet 2.
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 05:17:37 +0000 (05:17 +0000)]
style(DWG,pid1sht2):Align group titles, fix legend
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 04:55:18 +0000 (04:55 +0000)]
style(DWG):Group symbols, fix legend
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 04:52:34 +0000 (04:52 +0000)]
fix(TODO.org):Fix minor typo
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 04:02:05 +0000 (04:02 +0000)]
feat(DEL):Add PDFs of initial drafts of drawings
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 04:00:50 +0000 (04:00 +0000)]
feat(DWG):Add initial drafts of drawings
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 03:49:49 +0000 (03:49 +0000)]
chore(IMG):Add draft symbols for vessels and tanks (Groups 1,2)
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 03:47:09 +0000 (03:47 +0000)]
feat():Add REVISIONS and TODO file
REVISIONS.org - Track drawing revisions
TODO.org - Project task list
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 03:46:39 +0000 (03:46 +0000)]
feat(REF):Add cost estimate for ISO eng dwg standards
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 03:45:54 +0000 (03:45 +0000)]
feat(.gitignore):Add ignore file
Steven Baltakatei Sandoval [Thu, 24 Sep 2020 03:45:20 +0000 (03:45 +0000)]
init(README):Init repo with README